Added validation in config_loader to prevent bodies from starting too close
to their parent bodies (distance must be >= parent.radius + body.radius).
Changes:
- src/config_loader.cpp: Add parent-child distance validation before initialization
- tests/configs/earth_mars_simple.toml: Fix spacecraft position to LEO altitude
(Earth position + 6.571e6 m offset = 1.49606571e11 m)
- tests/test_invalid_parent_assignment.cpp: Update test 3 to use radius-based validation
- docs/mission_planning.md: Add TODO about spacecraft config pattern changes
Test results:
- Test 1: ✅ PASS (Earth no longer becomes child of spacecraft)
- Test 2: ✅ PASS (Mass hierarchy preserved)
- Test 3: ✅ PASS (Spacecraft at valid LEO position)
- Test 4: ❌ FAIL (mutual SOI bug, as expected)
This prevents the spacecraft initialization bug where Earth would incorrectly
become a child of the spacecraft due to distance=0.
- Add spacecraft body to earth_mars_simple.toml config file
- Implement initialize_spacecraft_leo() to set circular LEO at 200km altitude
- Implement apply_transfer_burn() for Hohmann transfer impulse burn
- Implement calculate_phase_angle() for launch window verification
- Add comprehensive test case with SOI transition tracking
- Preserve debug printf statements from main branch investigation
- LEO initialization verified: position, velocity, energy all correct
- Issue identified: delta-v calculation doesn't account for spacecraft LEO phase
- Test completes 8/9 assertions (fails post-burn energy check)
- Session documented in docs/leospacecraft_impulse_burn_plan.md
Next: Fix apply_transfer_burn() to use vector-based delta-v instead of magnitude-based
Add core orbital mechanics calculations and spacecraft spawning infrastructure
for interplanetary trajectory planning. Enables calculation of realistic
transfer orbits with proper departure window timing.
New Module (mission_planning.h/cpp):
- calculate_hohmann_transfer(): Returns transfer orbit parameters
- calculate_angular_position(): Computes body angle in XY plane
- calculate_required_phase_angle(): Calculates optimal launch phase
- check_launch_window(): Tests if current phase allows optimal launch
- wait_for_launch_window(): Fast-forwards to launch window
- spawn_spacecraft_on_transfer(): Creates spacecraft on transfer trajectory
Simulation Extensions (simulation.cpp/h):
- add_body_to_simulation(): Dynamic body creation at runtime
- Properly handles local/global coordinate initialization
- SOI radius calculation for dynamically added bodies
Test Suite:
- test_mission_planning.cpp: Core calculations validated
- test_hohmann_transfer.cpp: Spacecraft spawning verified
- earth_mars_simple.toml: Test configuration for transfers
Validations:
- Transfer parameters match NASA references (±5%)
- Earth→Mars transfer: 259 days, 44.3° phase, 2.94 km/s Δv
- Spacecraft spawns with correct velocity and position
- Launch window detection works (waits ~94 days for optimal window)
Status: Phases 1-3 complete, Phase 4 debugging in progress
(trajectory divergence after first update_simulation() call)
Core Changes:
- Remove new_parent != -1 check in update_simulation()
- Add special handling for root body transitions (parent_index = -1)
- Bodies can now transition to/from Sun (root)
- Proper coordinate transformation for body->root and root->body transitions
Implementation:
- Old parent = -1: local = global (no transformation needed)
- New parent = -1: global = local (no transformation needed)
- find_dominant_body() already handles -1 returns correctly
Testing:
- Add test_root_body_transitions.cpp with 2 test cases
- Test 1: Earth to Sun transition (validates Sun involvement)
- Test 2: Round-trip Earth -> Sun -> Mars -> Sun (multi-leg)
- Create manual_root_transition.toml config
- All 6 assertions passing
Results:
✅ Satellites can transition to/from Sun
✅ Multi-leg transitions work (Earth→Sun→Mars→Sun)
✅ Root body transitions validated
✅ Tests pass for patched conics scenarios
Files Modified:
- src/simulation.cpp (root body transition handling)
Files Created:
- tests/test_root_body_transitions.cpp (2 test cases)
- tests/configs/manual_root_transition.toml
- tests/configs/simple_root_transition.toml
- tests/configs/interplanetary_transfer.toml
Phase 1 Status: COMPLETE ✅
Next: Phase 2 - Adaptive Hysteresis